Coal Terminal Ship Loader Bogie Wheel

The existing structure was corroded and required replacing and there were no existing drawings for this assembly.  Gladstone Drafting were engaged to site measure and produce a set of ‘As built’ drawings, for the forward bogie wheel assembly of the Barney Point coal stacker, to enable fabrication and installation of replacement assemblies. 

Work included:

  • Site measure existing bogie wheel assembly,
  • Produce a 3D model of the existing arrangement,
  • Produce a preliminary General Arrangement for client approval,
  • Meet with client to discuss minor revisions, and
  • After approval produce ‘as built’ drawings.

 

Industry & Mining Design:
Mechanical design
Plant layout
Piping design & ISO's
Structural design
Access & Machinery Guarding design
Materials handling
Building Design:
House and unit design
3D realistic views
Interior design
Pre-designed or custom plans
Fabrication Industry:
Steel work shop details
Procast concrete details
Tilt-up concrete
Civil and Infrastructure Design:
Road and carpark
Site underground services modelling
Drainage design
Earthworks