Salvation Army Shed

Gladstone Drafting was contracted by a local building company to completed detailed design of this project. The project already had Design Approval for a different use. Gladstone drafting first completed drawings suitable to change the current Material Change of use application. Upon successful change of the MCU we provided Design and Drawings suitable for Building Application & construction.

Scroll to Top